About Us
History
Awards
Safety
Compliance
Locations
Divisions
Construction
Dredging
Marine Services
McNally
Healy Tibbitts
Projects
Featured
By Division
Equipment
Barges Available for Charter
Cranes
Dredges
Tugboats
Support Equipment
For Sale
Careers
Contact
Search Box
Search
Search Site
About Us
History
Awards
Safety
Compliance
Locations
Divisions
Construction
Marine Infrastructure
Energy
Transportation
Environmental
Dredging
Marine Services
Chartering
Heavy Lift & Salvage
Stevedoring
Towing
McNally
Healy Tibbitts
Projects
Featured
By Division
Construction
Dredging
Marine Services
Equipment
Barges Available for Charter
Deck Barges
ABS Classed Ocean Barges
Inland Spud Barges
Miscellaneous & Specialty
Hopper Barges
Cranes
Dredges
Tugboats
Support Equipment
Featured
For Sale
Floating Equipment
Land Based Equipment
Careers
Contact
Projects
Featured
By Division
Construction
Dredging
Marine Services
Offshore Platform - Gas Compression
Prev
Next
Loading…
Location
: Gulf of Paria, Trinidad
Owner
: Trinmar Limited
Completion Date
: January 1, 1993
Categories
: Specialty Projects, Platforms, Construction
The 35 million cubic feet-per-day gas compression platform was fabricated in the USA, transported to the site on Weeks' barges, and installed in 15 meters of water 20 kilometers offshore Point Fortin. The platform is designed to withstand severe earthquake loads and a 6.5 meter storm wave. The 900
-
ton deck was transported on a Weeks submersible barge, floated into position over the previously installed jacket and then lowered onto the jacket legs. The jacket and platform were specifically designed to accommodate the "float-in" system of installation.